More than 53 kilometers of the Horadiz-Aghband railway line built

The design works of the Horadiz-Aghband railway line, which is planned to be completed in 2024, with a length of 140.6 km, have been completed by 78%, and 38% (53.2 km) of the construction works have been completed, “Azerbaijan Railways” Closed Joint Stock Company told APA-Economics.

Being an internationally important route, the Horadiz-Agband railway will play a major role in the rapid transportation of goods between Asia and Europe in the near future.

Source: Azeri-Press News Agency

Back To Top