Construction Nears Completion on Horadiz-Jabrayil-Zangilan-Aghband Highway


Horadiz: The construction of the Horadiz-Jabrayil-Zangilan-Aghband highway, also known as the Zangezur corridor, has reached 93% completion, APA-Economics reports.



According to Azeri-Press News Agency, the total length of the road is 149.9 km, with the main section measuring 123.6 km. The highway is built to a technical grade of 1B, which supports high-speed and safe travel. The road’s width ranges from 14 to 21 meters, while the embankment width is between 21.5 and 29.5 meters. The highway is designed with 4 to 6 traffic lanes, ensuring smooth and safe traffic flow.